Sales (24m)
206District Ledger492 postcode units
TR12
Cornwall
Median Price (3Y)
£483,661Price Trend (5Y)
Not enough salesSales (24m)
206
Median Price (3Y)
£483,661
Price Trend (5Y)
Not enough sales
Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of TR12, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
54.4 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of TR12 is Solar at 30.7 MW (56.4% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 54.4 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near TR12, ordered by straight-line distance from the mapped centre.