Sales (24M)
4Active SectorUpdated 12h ago
B75 7EU
Middleton • Residential Catchment
Median Price
£505,675B75 3 year price trend
+33.6%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of B75 7EU, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
184 MW
Filtered total
Storage capacity
49.9 MW
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of B75 7EU is Gas at 111 MW (47.3% of capacity), compared with 30.1% nationally. Total mapped capacity within 10 miles is 234 MW, versus 105 GW nationally (0.2%).
Nearby power sites
Power sites near B75 7EU, ordered by straight-line distance from the mapped centre.