Active SectorUpdated 12h ago

B93 8BN

Knowle and Dorridge • Residential Catchment

Sales (24M)
5
Median Price2Y
£1,400,000
B93 3 year price trend
-44.8%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of B93 8BN, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

48.8 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of B93 8BN is Waste / EfW at 30.0 MW (61.5% of capacity), compared with 1.3% nationally. Total mapped capacity within 10 miles is 48.8 MW, versus 105 GW nationally (0.0%).

Nearby power sites

Power sites near B93 8BN, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Packington Generation Plant Phase 3
North Warwickshire · Warwickshire · West Midlands · England
Gas
Operational
8.50 MW
7.27 mi
Tyseley ERF
Birmingham · West Midlands · West Midlands · England
Waste / EfW
Operational
30.0 MW
7.39 mi
Birmingham Bio-Power Plant
Birmingham · West Midlands · West Midlands · England
Other
Operational
10.3 MW
7.62 mi