Active SectorUpdated 12h ago

BA5 1PD

Henton, Wookey • Residential Catchment

Sales (24M)
3
Median Price3Y
£585,000
BA5 3 year price trend
+20.0%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of BA5 1PD, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

107 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of BA5 1PD is Solar at 105 MW (98.1% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 107 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near BA5 1PD, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Hawkers Farm
Somerset · Somerset · South West · England
Solar
Operational
12.0 MW
2.17 mi
Whitley (Ashcott Farm) Solar Park
South West · England
Solar
Operational
7.57 MW
6.02 mi
Pitts Farm
South West · England
Solar
Operational
3.21 MW
6.07 mi
Crapnell Farm
South West · England
Solar
Operational
4.67 MW
6.37 mi
Shooters
South West · England
Wind
Operational
2.00 MW
7.01 mi
Mendip
South West · England
Solar
Operational
7.18 MW
7.05 mi
PARK WOOD SOLAR FARM
Somerset · Somerset · South West · England
Solar
Operational
5.00 MW
7.31 mi
Redlands Farm
Somerset · Somerset · South West · England
Solar
Operational
6.20 MW
7.59 mi
Copley Wood (Renewables (SW))
South West · England
Solar
Operational
1.50 MW
8.28 mi
Ashlawn Farm
Somerset · Somerset · South West · England
Solar
Operational
6.80 MW
8.47 mi
New Row Farm
South West · England
Solar
Operational
4.45 MW
8.55 mi
Pyde Drove
South West · England
Solar
Operational
8.44 MW
8.79 mi
Pylle Southern solar park (Lower Easton Farm)
Somerset · Somerset · South West · England
Solar
Operational
13.5 MW
9.04 mi
Higher Hill Farm (extension)
Somerset · Somerset · South West · England
Solar
Operational
5.00 MW
9.07 mi
Watchfield Solar Farm
South West · England
Solar
Operational
10.7 MW
9.58 mi
Somerton Door
South West · England
Solar
Operational
8.70 MW
9.67 mi