BB2 7FS
Myerscough Smithy, Balderstone • Residential Catchment
Median Price
Not availableBB2 3 year price trend
+7.9%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of BB2 7FS, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
109 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of BB2 7FS is Gas at 67.4 MW (62.1% of capacity), compared with 30.1% nationally. Total mapped capacity within 10 miles is 109 MW, versus 105 GW nationally (0.1%).
Nearby power sites
Power sites near BB2 7FS, ordered by straight-line distance from the mapped centre.