Active SectorUpdated 12h ago

CA7 4AT

Silloth, Silloth-On-Solway • Residential Catchment

Sales (24M)
1
Median Price4Y
£105,250
CA7 3 year price trend
+36.4%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CA7 4AT, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

42.6 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CA7 4AT is Wind at 19.3 MW (45.2% of capacity), compared with 35.8% nationally. Total mapped capacity within 10 miles is 42.6 MW, versus 105 GW nationally (0.0%). Wind capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near CA7 4AT, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Hellrigg
Cumberland · Cumbria · North West · England
Wind
Operational
9.20 MW
1.85 mi
Westnewton (BEGL4)
North West · England
Wind
Operational
6.15 MW
6.33 mi
Gedulah
North West · England
Solar
Operational
18.3 MW
6.62 mi
Aspatria Creamery
Cumberland · Cumbria · North West · England
Biomass
Operational
5.00 MW
7.92 mi
High Pow
North West · England
Wind
Operational
3.90 MW
9.53 mi