Sales (24M)
5Active SectorUpdated 12h ago
CB22 3DZ
Sawston • Residential Catchment
Median Price2Y
£390,000CB22 3 year price trend
-10.5%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of CB22 3DZ, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
180 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of CB22 3DZ is Solar at 152 MW (84.5% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 180 MW, versus 105 GW nationally (0.2%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near CB22 3DZ, ordered by straight-line distance from the mapped centre.