Active SectorUpdated 12h ago

CB24 5EU

Willingham • Residential Catchment

Sales (24M)
2
Median Price4Y
£385,000
CB24 3 year price trend
-2.1%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CB24 5EU, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

207 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CB24 5EU is Biomass at 92.4 MW (44.6% of capacity), compared with 4.1% nationally. Total mapped capacity within 10 miles is 207 MW, versus 105 GW nationally (0.2%).

Nearby power sites

Power sites near CB24 5EU, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Willburton 2 (Mingay Farm)
East of England · England
Solar
Operational
19.3 MW
4.78 mi
Mingay Farm
East Cambridgeshire · Cambridgeshire · Eastern · England
Solar
Operational
5.00 MW
5.39 mi
Wilburton
East of England · England
Solar
Operational
4.99 MW
5.39 mi
Wiggin Hill
East of England · England
Solar
Operational
11.4 MW
6.25 mi
Milton Landfill Site
South Cambridgeshire · Cambridgeshire · Eastern · England
Gas
Operational
2.00 MW
6.63 mi
Elean Business Park Biomass Plant
East Cambridgeshire · Cambridgeshire · Eastern · England
Biomass
Operational
40.0 MW
6.83 mi
EPR Ely Ltd
East of England · England
Biomass
Operational
38.0 MW
6.83 mi
Chittering 2
East of England · England
Solar
Operational
6.30 MW
7.06 mi
Stowbridge
East of England · England
Solar
Operational
24.3 MW
7.17 mi
Mepal CHP
East Cambridgeshire · Cambridgeshire · Eastern · England
Biomass
Operational
14.4 MW
8.21 mi
Godmanchester
Huntingdonshire · Cambridgeshire · Eastern · England
Gas
Operational
3.00 MW
8.81 mi
Skylark
East of England · England
Solar
Operational
4.94 MW
9.27 mi
Cantelupe Solar Farm
South Cambridgeshire · Cambridgeshire · Eastern · England
Solar
Operational
5.00 MW
9.67 mi
Honeysome
East of England · England
Solar
Operational
4.35 MW
9.94 mi
Red Tile
East of England · England
Wind
Operational
24.0 MW
9.95 mi