Sales (24M)
0Active SectorUpdated 12h ago
CB4 8QJ
Residential Catchment
Median Price
Not availableCB4 3 year price trend
+15.3%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of CB4 8QJ, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
318 MW
Filtered total
Storage capacity
50.0 MW
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of CB4 8QJ is Solar at 224 MW (60.8% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 368 MW, versus 105 GW nationally (0.4%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near CB4 8QJ, ordered by straight-line distance from the mapped centre.