Active SectorUpdated 12h ago

CB8 0AN

Newmarket • Residential Catchment

Sales (24m)
5
Median Price (3Y)
£234,250
CB8 Price Trend (5Y)
+0.1%/yr

Sales (24m)

5

Median Price (3Y)

£234,250

CB8 Price Trend (5Y)

+0.1%/yr

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CB8 0AN, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

399 MW

Filtered total

Storage capacity

50.0 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CB8 0AN is Solar at 371 MW (82.6% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 449 MW, versus 105 GW nationally (0.4%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near CB8 0AN, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Exning
East of England · England
Solar
Operational
30.3 MW
1.21 mi
Forest Heath Solar Farm
West Suffolk · Suffolk · Eastern · England
Solar
Operational
5.00 MW
1.64 mi
Breach Solar
East of England · England
Solar
Operational
67.4 MW
3.05 mi
Anchor Lane, Burwell - Battery Energy Storage
East Cambridgeshire · Cambridgeshire · Eastern · England
Battery
Operational
50.0 MW
3.52 mi
Goosehall
East of England · England
Solar
Operational
43.2 MW
4.28 mi
Burwell
East of England · England
Solar
Operational
69.9 MW
4.41 mi
Bracks Farm
East Cambridgeshire · Cambridgeshire · Eastern · England
Solar
Operational
28.0 MW
5.32 mi
Triangle Solar Farm Park
East Cambridgeshire · Cambridgeshire · Eastern · England
Solar
Operational
29.4 MW
5.61 mi
Bay Farm
West Suffolk · Suffolk · Eastern · England
Solar
Operational
8.10 MW
6.22 mi
Wadlow Wind Farm
South Cambridgeshire · Cambridgeshire · Eastern · England
Wind
Operational
26.0 MW
6.95 mi
Great Wilbraham Solar Farm
South Cambridgeshire · Cambridgeshire · Eastern · England
Solar
Operational
38.1 MW
7.08 mi
Chittering 2
East of England · England
Solar
Operational
6.30 MW
8.38 mi
Stowbridge
East of England · England
Solar
Operational
24.3 MW
8.87 mi
Lackford Estate Solar Park
West Suffolk · Suffolk · Eastern · England
Solar
Operational
20.9 MW
9.60 mi
Milton Landfill Site
South Cambridgeshire · Cambridgeshire · Eastern · England
Gas
Operational
2.00 MW
9.97 mi