Sales (24M)
4Active SectorUpdated 12h ago
CF31 1LW
Bridgend, Coity Higher • Residential Catchment
Median Price2Y
£254,000CF31 3 year price trend
+13.5%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of CF31 1LW, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
292 MW
Filtered total
Storage capacity
20.0 MW
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of CF31 1LW is Wind at 192 MW (61.3% of capacity), compared with 35.8% nationally. Total mapped capacity within 10 miles is 312 MW, versus 105 GW nationally (0.3%). Wind capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near CF31 1LW, ordered by straight-line distance from the mapped centre.