Sales (24M)
0Active SectorUpdated 12h ago
CF46 6DE
Trelewis, Bedlinog • Residential Catchment
Median Price3Y
£134,500CF46 3 year price trend
-37.5%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of CF46 6DE, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
194 MW
Filtered total
Storage capacity
20.0 MW
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of CF46 6DE is Wind at 122 MW (57.3% of capacity), compared with 35.8% nationally. Total mapped capacity within 10 miles is 214 MW, versus 105 GW nationally (0.2%). Wind capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near CF46 6DE, ordered by straight-line distance from the mapped centre.