Active SectorUpdated 12h ago

CH3 8HR

Tarvin • Residential Catchment

Sales (24M)
3
Median Price9Y
£650,000
CH3 3 year price trend
+13.7%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CH3 8HR, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

1.1 GW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CH3 8HR is Gas at 816 MW (71.8% of capacity), compared with 30.1% nationally. Total mapped capacity within 10 miles is 1.1 GW, versus 105 GW nationally (1.1%).

Nearby power sites

Power sites near CH3 8HR, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Huntington Water Treatment Works
Cheshire West and Chester · Cheshire · North West · England
Solar
Operational
7.20 MW
4.63 mi
Gowy Landfill Site, Cheshire (Extension)
Cheshire West and Chester · Cheshire · North West · England
Gas
Operational
6.00 MW
4.90 mi
Frodsham Wind Farm
North West · England
Wind
Operational
50.4 MW
6.95 mi
Ince Bio Power
Cheshire West and Chester · Cheshire · North West · England
Other
Operational
21.5 MW
7.37 mi
Rocksavage Power Company Ltd
North West · England
Gas
Operational
810 MW
7.85 mi
Frodsham Marsh
Cheshire West and Chester · Cheshire · North West · England
Wind
Operational
50.4 MW
8.15 mi
Runcorn EfW
Halton · Cheshire · North West · England
Waste / EfW
Operational
100 MW
9.87 mi
Runcorn Energy from Waste
North West · England
Other
Operational
91.0 MW
9.87 mi