Sales (24M)
4Active SectorUpdated 12h ago
CH41 0BH
Birkenhead • Residential Catchment
Median Price2Y
£85,000CH41 3 year price trend
-0.9%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of CH41 0BH, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
61.0 MW
Filtered total
Storage capacity
49.9 MW
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of CH41 0BH is Battery at 49.9 MW (45.0% of capacity), compared with 3.9% nationally. Total mapped capacity within 10 miles is 111 MW, versus 105 GW nationally (0.1%).
Nearby power sites
Power sites near CH41 0BH, ordered by straight-line distance from the mapped centre.