Sales (24M)
2Active SectorUpdated 12h ago
CH41 0BS
Birkenhead • Residential Catchment
Median Price6Y
£120,000CH41 3 year price trend
-0.9%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of CH41 0BS, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
61.0 MW
Filtered total
Storage capacity
49.9 MW
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of CH41 0BS is Battery at 49.9 MW (45.0% of capacity), compared with 3.9% nationally. Total mapped capacity within 10 miles is 111 MW, versus 105 GW nationally (0.1%).
Nearby power sites
Power sites near CH41 0BS, ordered by straight-line distance from the mapped centre.