Active SectorUpdated 12h ago

CH41 4HT

Birkenhead • Residential Catchment

Sales (24M)
5
Median Price2Y
£102,288
CH41 3 year price trend
-0.9%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CH41 4HT, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

61.0 MW

Filtered total

Storage capacity

250 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CH41 4HT is Battery at 250 MW (80.4% of capacity), compared with 3.9% nationally. Total mapped capacity within 10 miles is 311 MW, versus 105 GW nationally (0.3%).

Nearby power sites

Power sites near CH41 4HT, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Bidston Moss Landfill Scheme
Wirral · Merseyside · North West · England
Gas
Operational
2.30 MW
1.93 mi
Port of Liverpool - wind
Sefton · Merseyside · North West · England
Wind
Operational
10.0 MW
3.90 mi
Bromborough Dock Landfill Scheme
Wirral · Merseyside · North West · England
Gas
Operational
3.70 MW
4.01 mi
Lister Battery Limited - Battery Energy Storage System
Liverpool · Merseyside · North West · England
Battery
Operational
49.9 MW
4.72 mi
Cheshire
North West · England
Gas
Operational
40.0 MW
8.32 mi
National Grid Electricity Substation, Capenhurst Lane - Battery Storage
Cheshire West and Chester · Cheshire · North West · England
Battery
Operational
200 MW
9.68 mi
Kingspan Factory Wind Turbines
Flintshire · Flintshire · Wales · Wales
Wind
Operational
5.00 MW
9.98 mi