Active SectorUpdated 12h ago

CH42 5PS

Birkenhead • Residential Catchment

Sales (24M)
6
Median Price
£110,000
CH42 3 year price trend
-5.9%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CH42 5PS, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

77.0 MW

Filtered total

Storage capacity

250 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CH42 5PS is Battery at 250 MW (76.4% of capacity), compared with 3.9% nationally. Total mapped capacity within 10 miles is 327 MW, versus 105 GW nationally (0.3%).

Nearby power sites

Power sites near CH42 5PS, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Bromborough Dock Landfill Scheme
Wirral · Merseyside · North West · England
Gas
Operational
3.70 MW
2.56 mi
Bidston Moss Landfill Scheme
Wirral · Merseyside · North West · England
Gas
Operational
2.30 MW
3.25 mi
Lister Battery Limited - Battery Energy Storage System
Liverpool · Merseyside · North West · England
Battery
Operational
49.9 MW
4.83 mi
Port of Liverpool - wind
Sefton · Merseyside · North West · England
Wind
Operational
10.0 MW
5.07 mi
Cheshire
North West · England
Gas
Operational
40.0 MW
6.88 mi
National Grid Electricity Substation, Capenhurst Lane - Battery Storage
Cheshire West and Chester · Cheshire · North West · England
Battery
Operational
200 MW
8.22 mi
Kingspan Factory Wind Turbines
Flintshire · Flintshire · Wales · Wales
Wind
Operational
5.00 MW
9.51 mi
Parc Adfer EfW
Flintshire · Clwyd · Wales · Wales
Waste / EfW
Operational
16.0 MW
9.69 mi