Active SectorUpdated 12h ago

CH45 3NZ

Wallasey • Residential Catchment

Sales (24M)
6
Median Price
£270,000
CH45 3 year price trend
-5.9%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CH45 3NZ, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

275 MW

Filtered total

Storage capacity

49.9 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CH45 3NZ is Wind at 269 MW (82.8% of capacity), compared with 35.8% nationally. Total mapped capacity within 10 miles is 325 MW, versus 105 GW nationally (0.3%). Wind capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near CH45 3NZ, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Bidston Moss Landfill Scheme
Wirral · Merseyside · North West · England
Gas
Operational
2.30 MW
1.06 mi
Port of Liverpool - wind
Sefton · Merseyside · North West · England
Wind
Operational
10.0 MW
3.13 mi
Lister Battery Limited - Battery Energy Storage System
Liverpool · Merseyside · North West · England
Battery
Operational
49.9 MW
5.81 mi
Bromborough Dock Landfill Scheme
Wirral · Merseyside · North West · England
Gas
Operational
3.70 MW
6.42 mi
Burbo Extension
North West · England
Wind
Operational
259 MW
9.13 mi