Active SectorUpdated 12h ago

CH48 0RB

West Kirby • Residential Catchment

Sales (24M)
3
Median Price3Y
£191,000
CH48 3 year price trend
-38.1%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CH48 0RB, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

280 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CH48 0RB is Wind at 274 MW (97.9% of capacity), compared with 35.8% nationally. Total mapped capacity within 10 miles is 280 MW, versus 105 GW nationally (0.3%). Wind capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near CH48 0RB, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Bidston Moss Landfill Scheme
Wirral · Merseyside · North West · England
Gas
Operational
2.30 MW
5.28 mi
Kingspan Factory Wind Turbines
Flintshire · Flintshire · Wales · Wales
Wind
Operational
5.00 MW
5.50 mi
Bromborough Dock Landfill Scheme
Wirral · Merseyside · North West · England
Gas
Operational
3.70 MW
8.45 mi
Burbo Extension
North West · England
Wind
Operational
259 MW
8.53 mi
Port of Liverpool - wind
Sefton · Merseyside · North West · England
Wind
Operational
10.0 MW
9.24 mi