Active SectorUpdated 12h ago

CH61 3XT

Heswall • Residential Catchment

Sales (24M)
4
Median Price4Y
£222,500
CH61 3 year price trend
-7.6%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CH61 3XT, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

149 MW

Filtered total

Storage capacity

250 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CH61 3XT is Battery at 250 MW (62.6% of capacity), compared with 3.9% nationally. Total mapped capacity within 10 miles is 399 MW, versus 105 GW nationally (0.4%).

Nearby power sites

Power sites near CH61 3XT, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Bidston Moss Landfill Scheme
Wirral · Merseyside · North West · England
Gas
Operational
2.30 MW
4.11 mi
Bromborough Dock Landfill Scheme
Wirral · Merseyside · North West · England
Gas
Operational
3.70 MW
5.05 mi
Kingspan Factory Wind Turbines
Flintshire · Flintshire · Wales · Wales
Wind
Operational
5.00 MW
5.89 mi
Port of Liverpool - wind
Sefton · Merseyside · North West · England
Wind
Operational
10.0 MW
7.81 mi
National Grid Electricity Substation, Capenhurst Lane - Battery Storage
Cheshire West and Chester · Cheshire · North West · England
Battery
Operational
200 MW
8.45 mi
Parc Adfer EfW
Flintshire · Clwyd · Wales · Wales
Waste / EfW
Operational
16.0 MW
8.50 mi
Cheshire
North West · England
Gas
Operational
40.0 MW
8.56 mi
Lister Battery Limited - Battery Energy Storage System
Liverpool · Merseyside · North West · England
Battery
Operational
49.9 MW
8.58 mi
Shotwick
Wales · Wales
Solar
Operational
72.2 MW
9.23 mi