Active SectorUpdated 12h ago

CH62 1AF

Bebington • Residential Catchment

Sales (24M)
3
Median Price5Y
£83,250
CH62 3 year price trend
+0.9%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CH62 1AF, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

171 MW

Filtered total

Storage capacity

250 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CH62 1AF is Battery at 250 MW (59.4% of capacity), compared with 3.9% nationally. Total mapped capacity within 10 miles is 421 MW, versus 105 GW nationally (0.4%).

Nearby power sites

Power sites near CH62 1AF, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Bromborough Dock Landfill Scheme
Wirral · Merseyside · North West · England
Gas
Operational
3.70 MW
0.92 mi
Bidston Moss Landfill Scheme
Wirral · Merseyside · North West · England
Gas
Operational
2.30 MW
4.89 mi
Lister Battery Limited - Battery Energy Storage System
Liverpool · Merseyside · North West · England
Battery
Operational
49.9 MW
5.07 mi
Cheshire
North West · England
Gas
Operational
40.0 MW
5.24 mi
Port of Liverpool - wind
Sefton · Merseyside · North West · England
Wind
Operational
10.0 MW
6.32 mi
National Grid Electricity Substation, Capenhurst Lane - Battery Storage
Cheshire West and Chester · Cheshire · North West · England
Battery
Operational
200 MW
6.75 mi
Parc Adfer EfW
Flintshire · Clwyd · Wales · Wales
Waste / EfW
Operational
16.0 MW
8.56 mi
Shotwick
Wales · Wales
Solar
Operational
72.2 MW
8.74 mi
Ince Bio Power
Cheshire West and Chester · Cheshire · North West · England
Other
Operational
21.5 MW
8.94 mi
Kingspan Factory Wind Turbines
Flintshire · Flintshire · Wales · Wales
Wind
Operational
5.00 MW
9.65 mi