Sales (24M)
2Active SectorUpdated 12h ago
CH66 4RA
Ellesmere Port • Residential Catchment
Median Price2Y
£245,000CH66 3 year price trend
+77.4%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of CH66 4RA, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
2.7 GW
Filtered total
Storage capacity
200 MW
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of CH66 4RA is Gas at 2.2 GW (78.1% of capacity), compared with 30.1% nationally. Total mapped capacity within 10 miles is 2.9 GW, versus 105 GW nationally (2.7%).
Nearby power sites
Power sites near CH66 4RA, ordered by straight-line distance from the mapped centre.