Active SectorUpdated 12h ago

CH8 7DR

Holywell (flintshire), Whitford • Residential Catchment

Sales (24M)
3
Median Price3Y
£208,250
CH8 3 year price trend
-29.1%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CH8 7DR, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

1.4 GW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CH8 7DR is Gas at 1.4 GW (98.5% of capacity), compared with 30.1% nationally. Total mapped capacity within 10 miles is 1.4 GW, versus 105 GW nationally (1.3%).

Nearby power sites

Power sites near CH8 7DR, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Kingspan Factory Wind Turbines
Flintshire · Flintshire · Wales · Wales
Wind
Operational
5.00 MW
2.06 mi
Connahs Quay
Wales · Wales
Gas
Operational
1.4 GW
8.96 mi
Parc Adfer EfW
Flintshire · Clwyd · Wales · Wales
Waste / EfW
Operational
16.0 MW
9.23 mi