Sales (24m)
4Active SectorUpdated 12h ago
CM2 6EJ
Chelmsford • Residential Catchment
Median Price (3Y)
£370,000CM2 Price Trend (5Y)
+1.5%/yrSales (24m)
4
Median Price (3Y)
£370,000
CM2 Price Trend (5Y)
+1.5%/yr
Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of CM2 6EJ, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
84.1 MW
Filtered total
Storage capacity
10.0 MW
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of CM2 6EJ is Solar at 82.8 MW (88.0% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 94.1 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near CM2 6EJ, ordered by straight-line distance from the mapped centre.