Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of CM2 6NF, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
85.9 MW
Filtered total
Storage capacity
10.0 MW
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of CM2 6NF is Solar at 82.8 MW (86.3% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 95.9 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near CM2 6NF, ordered by straight-line distance from the mapped centre.