Active SectorUpdated 12h ago

CM4 0JX

Paslow Wood Common, High Ongar • Residential Catchment

Sales (24M)
4
Median Price4Y
£1,050,000
CM4 3 year price trend
+8.7%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CM4 0JX, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

78.4 MW

Filtered total

Storage capacity

99.4 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CM4 0JX is Battery at 99.4 MW (55.9% of capacity), compared with 3.9% nationally. Total mapped capacity within 10 miles is 178 MW, versus 105 GW nationally (0.2%).

Nearby power sites

Power sites near CM4 0JX, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Ongar Landfill Scheme 2
Epping Forest · Essex · Eastern · England
Gas
Operational
1.80 MW
1.40 mi
Roxwell Landfill Scheme
Chelmsford · Essex · Eastern · England
Gas
Operational
1.30 MW
6.97 mi
Crouch Solar Farm
Brentwood · Essex · Eastern · England
Solar
Operational
49.9 MW
7.97 mi
Crouch Solar Farm
Brentwood · Essex · Eastern · England
Battery
Operational
49.9 MW
7.97 mi
Outwood
East of England · England
Solar
Operational
4.97 MW
8.26 mi
Cranham
London · England
Solar
Operational
3.00 MW
9.10 mi
Ford Research And Engineering Centre, Dunton - Solar Farm
Basildon · Essex · Eastern · England
Solar
Operational
5.20 MW
9.11 mi
Clay Tye Farm Phase 1 - Storage Facility
Havering · London · London · England
Battery
Operational
49.5 MW
9.70 mi
Fairwinds
East of England · England
Solar
Operational
12.2 MW
9.82 mi