Active SectorUpdated 12h ago

CM5 0FZ

Fyfield • Residential Catchment

Sales (24M)
0
Median Price
Not available
CM5 3 year price trend
+14.0%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CM5 0FZ, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

53.0 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CM5 0FZ is Solar at 49.9 MW (94.2% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 53.0 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near CM5 0FZ, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Ongar Landfill Scheme 2
Epping Forest · Essex · Eastern · England
Gas
Operational
1.80 MW
2.80 mi
Roxwell Landfill Scheme
Chelmsford · Essex · Eastern · England
Gas
Operational
1.30 MW
6.21 mi
Wrights Flour Mills, Roydon Road - Solar Photovoltaic Panels
Epping Forest · Wiltshire · South West · England
Solar
Operational
49.9 MW
9.83 mi