Active SectorUpdated 12h ago

CM5 9NE

High Ongar • Residential Catchment

Sales (24M)
2
Median Price7Y
£420,000
CM5 3 year price trend
+14.0%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CM5 9NE, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

58.0 MW

Filtered total

Storage capacity

49.9 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CM5 9NE is Solar at 54.9 MW (50.9% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 108 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near CM5 9NE, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Ongar Landfill Scheme 2
Epping Forest · Essex · Eastern · England
Gas
Operational
1.80 MW
0.92 mi
Roxwell Landfill Scheme
Chelmsford · Essex · Eastern · England
Gas
Operational
1.30 MW
7.03 mi
Crouch Solar Farm
Brentwood · Essex · Eastern · England
Solar
Operational
49.9 MW
9.60 mi
Crouch Solar Farm
Brentwood · Essex · Eastern · England
Battery
Operational
49.9 MW
9.60 mi
Outwood
East of England · England
Solar
Operational
4.97 MW
9.90 mi