Active SectorUpdated 12h ago

CV4 9BT

Coventry • Residential Catchment

Sales (24M)
7
Median Price2Y
£178,000
CV4 3 year price trend
-21.0%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of CV4 9BT, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

25.6 MW

Filtered total

Storage capacity

98.0 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of CV4 9BT is Battery at 98.0 MW (79.3% of capacity), compared with 3.9% nationally. Total mapped capacity within 10 miles is 124 MW, versus 105 GW nationally (0.1%).

Nearby power sites

Power sites near CV4 9BT, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Coventry National Grid Substation, Hawkesbury Hall - Battery Storage
Coventry · West Midlands · West Midlands · England
Battery
Operational
98.0 MW
5.85 mi
Waverley Wood II
Warwick · Warwickshire · West Midlands · England
Gas
Operational
2.40 MW
5.89 mi
Land South of Pogmore Spinney
North Warwickshire · Warwickshire · West Midlands · England
Solar
Operational
5.00 MW
6.85 mi
Packington Generation Plant Phase 3
North Warwickshire · Warwickshire · West Midlands · England
Gas
Operational
8.50 MW
7.01 mi
Ling Hall
Rugby · Warwickshire · West Midlands · England
Solar
Operational
7.00 MW
9.70 mi
Judkins Landfill Site Phase 3
Nuneaton and Bedworth · Warwickshire · West Midlands · England
Gas
Operational
2.70 MW
9.73 mi