Active SectorUpdated 12h ago

DE75 7QR

Heanor, Heanor and Loscoe • Residential Catchment

Sales (24M)
5
Median Price2Y
£175,000
DE75 3 year price trend
-14.9%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of DE75 7QR, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

102 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of DE75 7QR is Gas at 54.8 MW (53.7% of capacity), compared with 30.1% nationally. Total mapped capacity within 10 miles is 102 MW, versus 105 GW nationally (0.1%).

Nearby power sites

Power sites near DE75 7QR, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Belper
North East · England
Solar
Operational
5.00 MW
3.70 mi
Watnall
East Midlands · England
Solar
Operational
10.0 MW
5.30 mi
Crow Trees Solar Farm
East Midlands · England
Solar
Operational
4.69 MW
7.09 mi
Eurocell Nickel, High View Road - Solar Pv System
Bolsover · Nottinghamshire · East Midlands · England
Solar
Operational
5.00 MW
7.35 mi
Derby Sewage Treatment Works
Derby · Derbyshire · East Midlands · England
Wind
Operational
5.00 MW
7.71 mi
Sutton Landfill Site
Ashfield · Nottinghamshire · East Midlands · England
Gas
Operational
3.00 MW
8.33 mi
Derby
East Midlands · England
Gas
Operational
50.0 MW
8.84 mi
Land North of the Wood at Averill Farm
North East Derbyshire · Derbyshire · East Midlands · England
Solar
Operational
5.00 MW
9.21 mi
Averill Farm
East Midlands · England
Solar
Operational
5.00 MW
9.25 mi
Sinfin Lane
Derby · Derbyshire · East Midlands · England
Other
Operational
7.50 MW
9.77 mi
Burntstump Landfill Scheme
Gedling · Nottinghamshire · East Midlands · England
Gas
Operational
1.80 MW
9.85 mi