Sales (24M)
2Active SectorUpdated 12h ago
DT2 0EJ
Toller Porcorum • Residential Catchment
Median Price8Y
£750,000DT2 3 year price trend
-20.7%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of DT2 0EJ, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
72.5 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of DT2 0EJ is Solar at 62.5 MW (86.2% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 72.5 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near DT2 0EJ, ordered by straight-line distance from the mapped centre.