Sales (24m)
5Active SectorUpdated 12h ago
FY6 0DR
Preesall and Knott End-On-Sea, Preesall • Residential Catchment
Median Price (3Y)
£177,000FY6 Price Trend (5Y)
+3.2%/yrSales (24m)
5
Median Price (3Y)
£177,000
FY6 Price Trend (5Y)
+3.2%/yr
Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of FY6 0DR, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
2.3 GW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of FY6 0DR is Nuclear at 2.3 GW (98.0% of capacity), compared with 5.6% nationally. Total mapped capacity within 10 miles is 2.3 GW, versus 105 GW nationally (2.2%).
Nearby power sites
Power sites near FY6 0DR, ordered by straight-line distance from the mapped centre.