Active SectorUpdated 12h ago

FY6 0DR

Preesall and Knott End-On-Sea, Preesall • Residential Catchment

Sales (24m)
5
Median Price (3Y)
£177,000
FY6 Price Trend (5Y)
+3.2%/yr

Sales (24m)

5

Median Price (3Y)

£177,000

FY6 Price Trend (5Y)

+3.2%/yr

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of FY6 0DR, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

2.3 GW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of FY6 0DR is Nuclear at 2.3 GW (98.0% of capacity), compared with 5.6% nationally. Total mapped capacity within 10 miles is 2.3 GW, versus 105 GW nationally (2.2%).

Nearby power sites

Power sites near FY6 0DR, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Jameson Road
Wyre · Lancashire · North West · England
Gas
Operational
4.30 MW
2.28 mi
Thornton Waste Recovery Park (Waste AD)
Wyre · Lancashire · North West · England
Biomass
Operational
9.00 MW
3.35 mi
Orchard End Windfarm
North West · England
Wind
Operational
4.00 MW
5.21 mi
Heysham 2
North West · England
Nuclear
Operational
1.2 GW
8.78 mi
Heysham 1
North West · England
Nuclear
Operational
1.1 GW
8.78 mi
Lancaster Wastewater Treatment Works
Lancaster · Lancashire · North West · England
Solar
Operational
6.20 MW
9.13 mi
Heysham South Wind Farm
North West · England
Wind
Operational
7.50 MW
9.31 mi
FannyHouse
North West · England
Solar
Operational
4.94 MW
9.47 mi
Arnawood
North West · England
Solar
Operational
4.99 MW
9.51 mi
West Field
North West · England
Solar
Operational
4.94 MW
9.71 mi