Sales (24M)
2Active SectorUpdated 12h ago
GL15 4ED
Blakeney (forest of Dean), Awre • Residential Catchment
Median Price5Y
£530,000GL15 3 year price trend
-11.0%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of GL15 4ED, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
111 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of GL15 4ED is Solar at 96.4 MW (86.5% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 111 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near GL15 4ED, ordered by straight-line distance from the mapped centre.