Sales (24M)
5Active SectorUpdated 12h ago
GL18 1FD
Newent • Residential Catchment
Median Price
£260,000GL18 3 year price trend
+29.4%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of GL18 1FD, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
32.6 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of GL18 1FD is Solar at 32.6 MW (100.0% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 32.6 MW, versus 105 GW nationally (0.0%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near GL18 1FD, ordered by straight-line distance from the mapped centre.