Active SectorUpdated 12h ago
GL2 4BY
Quedgeley and Hardwicke, Quedgeley • Residential Catchment
Sales (24m)
4Median Price (3Y)
£341,500GL2 Price Trend (5Y)
+2.5%/yrSales (24m)
4
Median Price (3Y)
£341,500
GL2 Price Trend (5Y)
+2.5%/yr
Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of GL2 4BY, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
77.8 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of GL2 4BY is Solar at 62.8 MW (80.7% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 77.8 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near GL2 4BY, ordered by straight-line distance from the mapped centre.