Active SectorUpdated 12h ago

HP2 5EL

Hemel Hempstead • Residential Catchment

Sales (24M)
4
Median Price5Y
£440,000
HP2 3 year price trend
+0.6%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of HP2 5EL, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

10.0 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of HP2 5EL is Solar at 10.0 MW (100.0% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 10.0 MW, versus 105 GW nationally (0.0%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near HP2 5EL, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Caddington Solar Farm (Phase 2)
Central Bedfordshire · Bedfordshire · Eastern · England
Solar
Operational
5.00 MW
6.83 mi
Lawrence End Park
East of England · England
Solar
Operational
5.00 MW
9.02 mi