Active SectorUpdated 12h ago

HP2 5SP

Hemel Hempstead • Residential Catchment

Sales (24M)
6
Median Price2Y
£245,000
HP2 3 year price trend
+0.6%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of HP2 5SP, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

19.1 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of HP2 5SP is Solar at 19.1 MW (100.0% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 19.1 MW, versus 105 GW nationally (0.0%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near HP2 5SP, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Caddington Solar Farm (Phase 2)
Central Bedfordshire · Bedfordshire · Eastern · England
Solar
Operational
5.00 MW
6.38 mi
Lawrence End Park
East of England · England
Solar
Operational
5.00 MW
8.97 mi
Long Meadow
South East · England
Solar
Operational
4.12 MW
9.44 mi
Great Seabrook
South East · England
Solar
Operational
4.97 MW
9.63 mi