Active SectorUpdated 12h ago

HP22 4HS

Oving • Residential Catchment

Sales (24M)
4
Median Price4Y
£675,000
HP22 3 year price trend
+22.4%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of HP22 4HS, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

188 MW

Filtered total

Storage capacity

93.2 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of HP22 4HS is Solar at 148 MW (52.5% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 281 MW, versus 105 GW nationally (0.3%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near HP22 4HS, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Aston Clinton
South East · England
Solar
Operational
24.2 MW
5.12 mi
Westcott Venture Park Phase 2 & 3
Buckinghamshire · Buckinghamshire · South East · England
Solar
Operational
15.0 MW
5.16 mi
Fox Covert Solar Farm
Buckinghamshire · Buckinghamshire · South East · England
Solar
Operational
22.0 MW
5.58 mi
Calvert Phase II
Buckinghamshire · Buckinghamshire · South East · England
Gas
Operational
11.2 MW
5.74 mi
Greatmoor EfW
Buckinghamshire · Buckinghamshire · South East · England
Waste / EfW
Operational
22.0 MW
6.23 mi
Gib Lane Solar farm (Extension)
Buckinghamshire · Buckinghamshire · South East · England
Solar
Operational
5.00 MW
6.65 mi
Arla Dairy Site
Buckinghamshire · Buckinghamshire · South East · England
Biomass
Operational
5.00 MW
6.88 mi
Gib Lane (Aston Clinton solar park)
Buckinghamshire · Buckinghamshire · South East · England
Solar
Operational
24.2 MW
7.49 mi
Bletchley Phase II
Buckinghamshire · Buckinghamshire · South East · England
Gas
Operational
2.20 MW
7.61 mi
Land at Thornborough Grounds
Buckinghamshire · Buckinghamshire · South East · England
Solar
Operational
5.00 MW
8.91 mi
Stratford Road Solar Farm
Buckinghamshire · Buckinghamshire · South East · England
Solar
Operational
7.00 MW
9.05 mi
Stony Energy Storage Facility
Buckinghamshire · Buckinghamshire · South East · England
Battery
Operational
79.9 MW
9.16 mi
Bumpers Lane Solar Farm
Buckinghamshire · Buckinghamshire · South East · England
Battery
Operational
13.3 MW
9.30 mi
Ilmer
East Midlands · England
Solar
Operational
5.00 MW
9.31 mi
Bumpers Farm 2
South East · England
Solar
Operational
12.0 MW
9.33 mi
Great Seabrook
South East · England
Solar
Operational
4.97 MW
9.36 mi
Gawcott Fields Farm
Buckinghamshire · Buckinghamshire · South East · England
Solar
Operational
9.20 MW
9.41 mi
Long Meadow
South East · England
Solar
Operational
4.12 MW
9.56 mi
Church Farm - Slapton
South East · England
Solar
Operational
4.98 MW
9.76 mi
Thame
South East · England
Solar
Operational
4.79 MW
9.99 mi