Sales (24M)
2Active SectorUpdated 12h ago
IP26 5AW
Foulden • Residential Catchment
Median Price5Y
£575,000IP26 3 year price trend
+58.4%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of IP26 5AW, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
81.9 MW
Filtered total
Storage capacity
7.50 MW
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of IP26 5AW is Biomass at 41.5 MW (46.4% of capacity), compared with 4.1% nationally. Total mapped capacity within 10 miles is 89.4 MW, versus 105 GW nationally (0.1%).
Nearby power sites
Power sites near IP26 5AW, ordered by straight-line distance from the mapped centre.