Active SectorUpdated 12h ago

LA2 8AX

Hornby, Hornby-With-Farleton • Residential Catchment

Sales (24M)
3
Median Price7Y
£123,375
LA2 3 year price trend
+17.8%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of LA2 8AX, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

38.2 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of LA2 8AX is Solar at 16.2 MW (42.4% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 38.2 MW, versus 105 GW nationally (0.0%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near LA2 8AX, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Caton Moor Windfarm Repowering
Lancaster · Lancashire · North West · England
Wind
Operational
16.0 MW
2.64 mi
Ravens Close
North Yorkshire · North Yorkshire · Yorkshire and Humber · England
Solar
Operational
5.00 MW
3.84 mi
Salt Ayre
Lancaster · Lancashire · North West · England
Gas
Operational
4.00 MW
8.72 mi
Lune Power
Lancaster · Lancashire · North West · England
Gas
Operational
2.00 MW
8.72 mi
Arnawood
North West · England
Solar
Operational
4.99 MW
9.18 mi
Lancaster Wastewater Treatment Works
Lancaster · Lancashire · North West · England
Solar
Operational
6.20 MW
9.52 mi