Active SectorUpdated 12h ago

LE19 3FD

Enderby and Narborough, Narborough • Residential Catchment

Sales (24m)
8
Median Price (3Y)
£380,000
Price Trend (3Y)
-21.7%

Sales (24m)

8

Median Price (3Y)

£380,000

Price Trend (3Y)

-21.7%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of LE19 3FD, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

112 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of LE19 3FD is Solar at 91.3 MW (81.9% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 112 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near LE19 3FD, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Narborough Landfill
Blaby · Leicestershire · East Midlands · England
Gas
Operational
2.70 MW
0.69 mi
Enderby Warren Phase II
Blaby · Leicestershire · East Midlands · England
Gas
Operational
4.90 MW
1.30 mi
Warren Quarry Landfill Gas Scheme
Blaby · Leicestershire · East Midlands · England
Gas
Operational
1.90 MW
1.37 mi
Blaby
East Midlands · England
Solar
Operational
3.48 MW
3.41 mi
Desford Solar Farm
Hinckley and Bosworth · Leicestershire · East Midlands · England
Solar
Operational
5.00 MW
4.68 mi
Low Spinney
East Midlands · England
Wind
Operational
8.20 MW
5.43 mi
Lindridge
East Midlands · England
Solar
Operational
4.92 MW
6.08 mi
Bradgate Quarry Landfill Gas Scheme
Hinckley and Bosworth · Leicestershire · East Midlands · England
Gas
Operational
2.50 MW
6.65 mi
Hall Farm Solar Farm (Newbold Verdon)
Hinckley and Bosworth · Leicestershire · East Midlands · England
Solar
Operational
5.00 MW
6.72 mi
Stables Farm
East Midlands · England
Solar
Operational
1.97 MW
8.20 mi
Basin Bridge
East Midlands · England
Solar
Operational
4.99 MW
8.71 mi
Crown Farm
Hinckley and Bosworth · Leicestershire · East Midlands · England
Solar
Operational
6.00 MW
8.82 mi
Nailstone
East Midlands · England
Solar
Operational
4.98 MW
8.82 mi
Tower Hayes
East Midlands · England
Solar
Operational
5.00 MW
9.61 mi
Streetfield
West Midlands · England
Solar
Operational
50.0 MW
9.69 mi