Active SectorUpdated 12h ago

LE67 2NP

Hugglescote, Hugglescote and Donington Le Heath • Residential Catchment

Sales (24M)
23
Median Price
£354,000
LE67 3 year price trend
-3.1%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of LE67 2NP, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

159 MW

Filtered total

Storage capacity

10.0 MW

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of LE67 2NP is Solar at 105 MW (62.0% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 169 MW, versus 105 GW nationally (0.2%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near LE67 2NP, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Tower Hayes
East Midlands · England
Solar
Operational
5.00 MW
1.10 mi
Ibstock
West Midlands · England
Solar
Operational
4.82 MW
1.57 mi
Crown Farm
Hinckley and Bosworth · Leicestershire · East Midlands · England
Solar
Operational
6.00 MW
3.10 mi
Nailstone
East Midlands · England
Solar
Operational
4.98 MW
3.10 mi
Newhurst Quarry
Charnwood · Leicestershire · East Midlands · England
Waste / EfW
Operational
42.0 MW
4.60 mi
Hill Farm - Energy Barn
North West Leicestershire · Leicestershire · East Midlands · England
Battery
Operational
10.0 MW
4.64 mi
Spring Lane
East Midlands · England
Solar
Operational
0.96 MW
4.64 mi
Lindridge
East Midlands · England
Solar
Operational
4.92 MW
4.81 mi
Packington Solar Farm
North West Leicestershire · Leicestershire · East Midlands · England
Solar
Operational
13.9 MW
4.99 mi
Bradgate Quarry Landfill Gas Scheme
Hinckley and Bosworth · Leicestershire · East Midlands · England
Gas
Operational
2.50 MW
5.22 mi
Lount/Smoile
North West Leicestershire · Leicestershire · East Midlands · England
Gas
Operational
1.10 MW
5.22 mi
Hall Farm Solar Farm (Newbold Verdon)
Hinckley and Bosworth · Leicestershire · East Midlands · England
Solar
Operational
5.00 MW
5.34 mi
Desford Solar Farm
Hinckley and Bosworth · Leicestershire · East Midlands · England
Solar
Operational
5.00 MW
6.13 mi
Langley Priory, Walnut Yard (Phase 2)
North West Leicestershire · Leicestershire · East Midlands · England
Solar
Operational
6.20 MW
6.38 mi
Ashby
East Midlands · England
Solar
Operational
4.80 MW
6.64 mi
Prestop Park
East Midlands · England
Solar
Operational
15.8 MW
6.85 mi
Langley Priory
East Midlands · England
Solar
Operational
2.04 MW
6.93 mi
Land at Mill Farm
Charnwood · Leicestershire · East Midlands · England
Solar
Operational
7.10 MW
7.67 mi
Short Hazel
East Midlands · England
Solar
Operational
5.00 MW
8.10 mi
Mountsorrel Landfill Site
Charnwood · Leicestershire · East Midlands · England
Gas
Operational
1.60 MW
8.40 mi
Shortheath Solar Park
South Derbyshire · Derbyshire · East Midlands · England
Solar
Operational
5.00 MW
8.48 mi
Warren Quarry Landfill Gas Scheme
Blaby · Leicestershire · East Midlands · England
Gas
Operational
1.90 MW
9.71 mi
Enderby Warren Phase II
Blaby · Leicestershire · East Midlands · England
Gas
Operational
4.90 MW
9.72 mi
Stables Farm
East Midlands · England
Solar
Operational
1.97 MW
9.76 mi
East Midlands Distribution Centre, Arundel Avenue - Solar Panels
North West Leicestershire · Leicestershire · East Midlands · England
Solar
Operational
6.10 MW
9.88 mi