Sales (24M)
6Active SectorUpdated 12h ago
ME14 1ER
Maidstone • Residential Catchment
Median Price
£88,000ME14 3 year price trend
+3.4%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of ME14 1ER, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
140 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of ME14 1ER is Solar at 88.3 MW (62.8% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 140 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.
Nearby power sites
Power sites near ME14 1ER, ordered by straight-line distance from the mapped centre.