Active SectorUpdated 12h ago

NG33 5PT

South Witham • Residential Catchment

Sales (24M)
4
Median Price3Y
£210,000
NG33 3 year price trend
+45.1%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of NG33 5PT, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

16.6 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of NG33 5PT is Solar at 14.0 MW (84.3% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 16.6 MW, versus 105 GW nationally (0.0%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near NG33 5PT, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Colsterworth Landfill Gas Project
South Kesteven · Lincolnshire · East Midlands · England
Gas
Operational
2.60 MW
3.03 mi
Mill Farm
East Midlands · England
Solar
Operational
5.00 MW
7.63 mi
Ketton solar farm - phase 2
Rutland · Leicestershire · East Midlands · England
Solar
Operational
9.00 MW
9.09 mi