Active SectorUpdated 12h ago

NG4 3SD

Carlton (gedling) • Residential Catchment

Sales (24M)
5
Median Price
£250,000
NG4 3 year price trend
-1.4%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of NG4 3SD, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

110 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of NG4 3SD is Solar at 89.8 MW (81.5% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 110 MW, versus 105 GW nationally (0.1%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near NG4 3SD, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Gedling
East Midlands · England
Solar
Operational
5.74 MW
1.27 mi
Eastcroft EfW (Lines 1 & 2)
Nottingham · Nottinghamshire · East Midlands · England
Waste / EfW
Operational
9.00 MW
2.52 mi
Radcliffe
East Midlands · England
Solar
Operational
4.16 MW
2.80 mi
Dorket Head
Gedling · Nottinghamshire · East Midlands · England
Gas
Operational
2.80 MW
3.43 mi
Stragglethorpe
East Midlands · England
Solar
Operational
5.00 MW
4.00 mi
Cotgrave
Rushcliffe · Nottinghamshire · East Midlands · England
Solar
Operational
4.98 MW
4.25 mi
Burntstump Landfill Scheme
Gedling · Nottinghamshire · East Midlands · England
Gas
Operational
1.80 MW
5.09 mi
Watnall
East Midlands · England
Solar
Operational
10.0 MW
6.50 mi
Langar Lane
Rushcliffe · Nottinghamshire · East Midlands · England
Solar
Operational
10.0 MW
7.73 mi
Kingston Solar farm
Rushcliffe · Nottinghamshire · East Midlands · England
Solar
Operational
49.9 MW
9.36 mi
John Brooke Sawmills Limited - Biomass Gasifier
Rushcliffe · Nottinghamshire · East Midlands · England
Biomass
Operational
6.80 MW
9.53 mi