Active SectorUpdated 12h ago

OX27 0HT

Marsh Gibbon • Residential Catchment

Sales (24m)
3
Median Price (3Y)
£450,000
OX27 Price Trend (5Y)
+1.6%/yr

Sales (24m)

3

Median Price (3Y)

£450,000

OX27 Price Trend (5Y)

+1.6%/yr

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of OX27 0HT, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

183 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of OX27 0HT is Solar at 124 MW (67.8% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 183 MW, versus 105 GW nationally (0.2%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near OX27 0HT, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Greatmoor EfW
Buckinghamshire · Buckinghamshire · South East · England
Waste / EfW
Operational
22.0 MW
2.63 mi
Calvert Phase II
Buckinghamshire · Buckinghamshire · South East · England
Gas
Operational
11.2 MW
2.80 mi
Brook Farm
South East · England
Solar
Operational
8.91 MW
4.46 mi
Bicester
South East · England
Solar
Operational
18.4 MW
4.54 mi
Shelswell
South East · England
Solar
Operational
5.06 MW
5.44 mi
Westcott Venture Park Phase 2 & 3
Buckinghamshire · Buckinghamshire · South East · England
Solar
Operational
15.0 MW
5.91 mi
New Stone House
South East · England
Solar
Operational
11.5 MW
6.12 mi
Gawcott Fields Farm
Buckinghamshire · Buckinghamshire · South East · England
Solar
Operational
9.20 MW
6.28 mi
Ardley Fields Farm Landfill Site
Cherwell · Oxfordshire · South East · England
Gas
Operational
1.80 MW
6.97 mi
Ardley EfW
Cherwell · Oxfordshire · South East · England
Waste / EfW
Operational
24.0 MW
7.50 mi
Fox Covert Solar Farm
Buckinghamshire · Buckinghamshire · South East · England
Solar
Operational
22.0 MW
7.85 mi
Rowles
South East · England
Solar
Operational
12.8 MW
8.25 mi
Land at Thornborough Grounds
Buckinghamshire · Buckinghamshire · South East · England
Solar
Operational
5.00 MW
9.10 mi
Turweston
South East · England
Solar
Operational
16.4 MW
9.52 mi