Active SectorUpdated 12h ago

PE17 3DD

Residential Catchment

Sales (24m)
0
Median Price (3Y)
Not available
PE17 Price Trend (5Y)
Not enough sales

Sales (24m)

0

Median Price (3Y)

Not available

PE17 Price Trend (5Y)

Not enough sales

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of PE17 3DD, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

269 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of PE17 3DD is Solar at 99.7 MW (37.1% of capacity), compared with 10.8% nationally. Total mapped capacity within 10 miles is 269 MW, versus 105 GW nationally (0.3%). Solar capacity is a theoretical maximum; actual output depends on weather conditions.

Nearby power sites

Power sites near PE17 3DD, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Wiggin Hill
East of England · England
Solar
Operational
11.4 MW
3.26 mi
RamseySolar
East of England · England
Solar
Operational
4.97 MW
5.15 mi
Land at Biggin Lane
Huntingdonshire · Cambridgeshire · Eastern · England
Solar
Operational
5.00 MW
5.46 mi
Ramsey 2 Wind Farm
East of England · England
Wind
Operational
8.00 MW
6.04 mi
Honeysome
East of England · England
Solar
Operational
4.35 MW
6.04 mi
Mepal CHP
East Cambridgeshire · Cambridgeshire · Eastern · England
Biomass
Operational
14.4 MW
6.37 mi
Godmanchester
Huntingdonshire · Cambridgeshire · Eastern · England
Gas
Operational
3.00 MW
6.39 mi
Abbots Ripton
East of England · England
Solar
Operational
24.7 MW
6.41 mi
Bury Green
East of England · England
Solar
Operational
4.97 MW
6.49 mi
Red Tile
East of England · England
Wind
Operational
24.0 MW
6.86 mi
Elean Business Park Biomass Plant
East Cambridgeshire · Cambridgeshire · Eastern · England
Biomass
Operational
40.0 MW
7.48 mi
EPR Ely Ltd
East of England · England
Biomass
Operational
38.0 MW
7.48 mi
Huntingdon
East of England · England
Solar
Operational
10.2 MW
8.33 mi
Willburton 2 (Mingay Farm)
East of England · England
Solar
Operational
19.3 MW
9.29 mi
Station Farm Landfill Scheme
Huntingdonshire · Cambridgeshire · Eastern · England
Gas
Operational
2.00 MW
9.30 mi
Ransonmoor
East of England · England
Wind
Operational
10.0 MW
9.35 mi
Mingay Farm
East Cambridgeshire · Cambridgeshire · Eastern · England
Solar
Operational
5.00 MW
9.41 mi
Wilburton
East of England · England
Solar
Operational
4.99 MW
9.41 mi
Greenvale March
East of England · England
Wind
Operational
1.50 MW
9.41 mi
Glass moor Extension
Fenland · Cambridgeshire · Eastern · England
Wind
Operational
16.0 MW
9.53 mi
Glassmoor II
East of England · England
Wind
Operational
12.3 MW
9.53 mi
Burnthouse
East of England · England
Solar
Operational
4.76 MW
9.94 mi