Active SectorUpdated 12h ago

PE20 3NR

Swineshead • Residential Catchment

Sales (24M)
4
Median Price4Y
£226,000
PE20 3 year price trend
-3.1%

Sites and CapacityA map view of the GB National Grid infrastructure.

Nearby major power sites within 10 miles of PE20 3NR, covering operational assets and significant projects now in construction or pipeline.

Generating capacity

447 MW

Filtered total

Storage capacity

-

Filtered total

Technology

All

Mapped categories

Insights

Largest mapped technology within 10 miles of PE20 3NR is Gas at 301 MW (67.4% of capacity), compared with 30.1% nationally. Total mapped capacity within 10 miles is 447 MW, versus 105 GW nationally (0.4%).

Nearby power sites

Power sites near PE20 3NR, ordered by straight-line distance from the mapped centre.

SiteTechnologyStatusCapacityDistance
Bicker Fen
East Midlands · England
Wind
Operational
26.0 MW
2.55 mi
Nowhere Farm
Boston · Lincolnshire · East Midlands · England
Solar
Operational
8.10 MW
2.65 mi
Kirton
East Midlands · England
Solar
Operational
3.51 MW
3.10 mi
Friths Farm
Boston · Lincolnshire · East Midlands · England
Solar
Operational
28.0 MW
3.86 mi
Riverside Industrial Estate Gasification Plant
Boston · Lincolnshire · East Midlands · England
Other
Operational
10.5 MW
6.10 mi
Canopus
East Midlands · England
Solar
Operational
5.00 MW
6.11 mi
Riverside Industrial Estate - Solar PV Panels
Boston · Lincolnshire · East Midlands · England
Solar
Operational
9.70 MW
6.64 mi
Boston Landfill Scheme
Boston · Lincolnshire · East Midlands · England
Gas
Operational
1.30 MW
6.82 mi
Grange Farm (Burton Pedwardine)
North Kesteven · Lincolnshire · East Midlands · England
Solar
Operational
15.0 MW
8.38 mi
Spalding Expansion OCGT
East Midlands · England
Gas
Operational
300 MW
9.71 mi
Sleaford Renewable Energy Plant
North Kesteven · Lincolnshire · East Midlands · England
Biomass
Operational
40.0 MW
9.99 mi