Sales (24M)
6Active SectorUpdated 12h ago
PE27 3FE
St Ives (huntingdonshire), St. Ives • Residential Catchment
Median Price2Y
£166,000PE27 3 year price trend
+8.6%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of PE27 3FE, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
236 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of PE27 3FE is Biomass at 92.4 MW (39.2% of capacity), compared with 4.1% nationally. Total mapped capacity within 10 miles is 236 MW, versus 105 GW nationally (0.2%).
Nearby power sites
Power sites near PE27 3FE, ordered by straight-line distance from the mapped centre.