Sales (24M)
5Active SectorUpdated 12h ago
PE27 3HA
St Ives (huntingdonshire), St. Ives • Residential Catchment
Median Price2Y
£195,000PE27 3 year price trend
+8.6%Sites and CapacityA map view of the GB National Grid infrastructure.
Nearby major power sites within 10 miles of PE27 3HA, covering operational assets and significant projects now in construction or pipeline.
Generating capacity
252 MW
Filtered total
Storage capacity
-
Filtered total
Technology
All
Mapped categories
Insights
Largest mapped technology within 10 miles of PE27 3HA is Biomass at 92.4 MW (36.7% of capacity), compared with 4.1% nationally. Total mapped capacity within 10 miles is 252 MW, versus 105 GW nationally (0.2%).
Nearby power sites
Power sites near PE27 3HA, ordered by straight-line distance from the mapped centre.